Precision Engineering Software

From design table to site bracket — in one signed file.

Tray sizing, support statics, seismic, cable pulling, ductbank thermal and route design — one project, one calculation chain, one approved deliverable your site crew can actually use.

Cable Tray Support 3D Modelling Seismic Cable Pulling Thermal Ductbank Route Designer Reports
14 days demo · Cancel anytime · Windows 10/11

Built around international standards

IEC 60364 IEEE 1185 NEC 392 BS 7671 VDE 0100 ASCE 7-22 EN 1998-1 EN 1993-1-2 DIN 4102-12

Manufacturer catalogs included

Prysmian Nexans Lapp Draka Eupen HES Öznur Vatan Hilti OBO Niedax Pemsa Cablofil Vergokan EAE İnka
13+ International standards
24 UI languages
16+ Manufacturer catalogs
100% Local & offline
Capabilities

Everything you need in one workspace

From ampacity and tray fill to pulling, seismic, fire and support statics — nine integrated modules sharing one project model.

Pulling Tension Analysis

Sequential capstan equation, sidewall pressure (7300 N/m), friction decay, weight correction — IEEE 1185 compliant.

Ampacity & Grouping

Full IEC 60364-5-52 tables B.52.17–21, NEC 310.16, BS 7671 — multi-tier derating, temperature & soil correction.

Seismic Verification

ASCE 7-22 (ap=2.5, Rp=6.0) and EN 1998-1 (Type 1/Type 2) — bracket, support, fastener checks.

Fire & Fault Current

EN 1993-1-2 steel reduction (ky/kE), DIN 4102-12 fire rating, IEC 60364-4-43 adiabatic I²·t = K²·S².

3D Visualization

LOD 500 parametric 3D — every cable, support and anchor to scale, with stress colouring and force diagrams on the model.

Multi-format Export

Engineering PDF reports with title block, DXF drawings, Excel bill of materials and QR-coded field labels.

QR Field Labels

Print weather-resistant QR stickers. Scan in field — instant fill %, ampacity, revision, compliance status. No app needed.

Route Designer

Interactive route sketching — click to place, ortho and grid snap. DXF round-trip with IEC 60617 symbol library.

Support & Anchor Design

8 support types with EN 1993 member checks, EN 1992-4 concrete anchor design, M/V/δ diagrams and real manufacturer catalogs.

QR Field Labels · Industry First

From calculation to scannable field asset

Every tray gets a printable QR sticker. Scan it on site to see real-time fill, ampacity, compliance status — without opening a laptop or returning to the office.

1

Generate & print

simulATe builds a printable PDF sticker sheet with QR + tray ID + key specs. Use any label printer.

2

Apply on tray

Stick during installation. Weather-resistant material — survives outdoor, industrial and humid environments.

3

Scan & verify

Any phone camera works. See fill %, ampacity, last calc revision, compliance — opens in browser. No app, no login.

No app required Any QR scanner or default camera works. Opens in mobile browser.
Always up to date Re-export QR after recalc — old sticker still works, redirects to latest revision.
Audit-ready Inspector scans → sees IEC compliance, calculation date, revision history. One scan = full audit trail.
Compliance

Engineered around the standards that matter

Every calculation traces to a published table or formula — verified against industry reference software.

Standard Scope Region
IEC 60364-5-52Ampacity, grouping (B.52.17–21)Global
IEC 60364-4-43Fault current (adiabatic)Global
IEEE 1185Cable pulling, sidewall pressureUSA
NEC 310.16 / 392.22Ampacity, tray deratingUSA
BS 7671Installation requirementsUK
VDE 0100Low-voltage installationsDE
ASCE 7-22Seismic (non-structural)USA
EN 1998-1Eurocode 8 seismicEU
EN 1993-1-2Steel fire reductionEU
DIN 4102-12Fire resistance ratingDE
3D Visualization

See your trays in true LOD 500

Every cable, support, bracket and bend rendered to scale. Inspect from any angle, export as DXF or PDF, share with the project team.

  • Parametric 3D bundle visualization
  • Interactive route designer with grid snapping
  • Bidirectional DXF import/export
  • IEC 60617 symbol library
simulATe Support Static Analysis — free-body diagram, M/V/δ and utilization
Pricing

Simple, transparent plans

Try the full feature set free for 14 days. You won’t be charged if you cancel before the trial ends.

Demo

Free

14 days · full features

  • All analysis modules
  • 24-language UI
  • PDF & DXF export
  • 14-day limit
Start Free Trial

Standard

49 499 /month /year

Save 89€ vs monthly

  • All analysis modules
  • All standards (IEC/NEC/BS/VDE)
  • PDF, DXF, Excel export
  • Email support
  • All updates within version
Subscribe Standard

Need site licenses or custom integration? Contact Sales →

FAQ

Common questions

Which Windows versions are supported?

Windows 10 and 11 (x64). Python runtime is bundled — no separate installation needed.

Can I use it offline?

Yes, the entire workspace runs locally. Only license activation requires internet (once).

Which cable manufacturers are included?

Prysmian, Nexans, Lapp, Draka, Eupen, HES, Öznur, Vatan — with regular catalog updates.

Do you offer refunds?

14-day money-back guarantee on monthly subscriptions. Yearly plans: prorated refund within 30 days.

How do updates work?

All bug fixes and feature updates within your version (e.g. 4.x) are included. Major version upgrades are discounted for active subscribers.

Is my data private?

All project data stays on your machine. We don't collect calculations, drawings, or any project content. GDPR compliant.

Get in touch

Have a question? We'd love to hear from you.

Send us a message — technical questions, licensing requests, or feature suggestions.

Your message opens your email client and is sent to our team. We typically respond within 24 hours.